• Login
    View Item 
    •   Home
    • IRAC Institute for Research in Applicable Computing - to April 2016
    • Centre for Research in Distributed Technologies (CREDIT)
    • View Item
    •   Home
    • IRAC Institute for Research in Applicable Computing - to April 2016
    • Centre for Research in Distributed Technologies (CREDIT)
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Browse

    All of UOBREPCommunitiesTitleAuthorsIssue DateSubmit DateSubjectsPublisherJournalDepartmentThis CollectionTitleAuthorsIssue DateSubmit DateSubjectsPublisherJournalDepartment

    My Account

    LoginRegister

    About

    AboutLearning ResourcesResearch Graduate SchoolResearch InstitutesUniversity Website

    Statistics

    Display statistics

    Scheduling of multistage multiproduct chemical batch plants using a constraint-based approach

    • CSV
    • RefMan
    • EndNote
    • BibTex
    • RefWorks
    Thumbnail
    Name:
    Publisher version
    View Source
    Access full-text PDFOpen Access
    View Source
    Check access options
    Check access options
    Authors
    Huang, Wei
    Chung, Paul Wai Hing
    Affiliation
    Loughborough University
    Issue Date
    1999
    Subjects
    scheduling
    chemical batch plants
    
    Metadata
    Show full item record
    Abstract
    Multistage multiproduct chemical batch plants provide great flexibility but the task of scheduling them to meet product demands can be challenging. A typical scheduling problem involves the allocation of resources over time. A constraint-based approach to solve this kind of scheduling problems is considered. The essential feature of this approach is that it does not require elaborate mathematical formulae, but it requires a problem to be stated in terms of constraints. A general constraint model was created to represent a common class of chemical batch plants and a scheduling system was produced based on this model. A user can simply input the information of production requirements through a user interface and, if necessary, modify the constraints related to the specific problem and a viable schedule is created automatically.
    Citation
    Huang, W., Chung, P.W.H. (1999) 'Scheduling of multistage multiproduct chemical batch plants using a constraint-based approach', Computers & Chemical Engineering 23:S511-S514
    Publisher
    Elsevier
    Journal
    Computers & Chemical Engineering
    URI
    http://hdl.handle.net/10547/275997
    DOI
    10.1016/S0098-1354(99)80126-4
    Additional Links
    http://linkinghub.elsevier.com/retrieve/pii/S0098135499801264
    Type
    Article
    Language
    en
    ISSN
    0098-1354
    ae974a485f413a2113503eed53cd6c53
    10.1016/S0098-1354(99)80126-4
    Scopus Count
    Collections
    Centre for Research in Distributed Technologies (CREDIT)

    entitlement

     
    DSpace software (copyright © 2002 - 2021)  DuraSpace
    Quick Guide | Contact Us
    Open Repository is a service operated by 
    Atmire NV
     

    Export search results

    The export option will allow you to export the current search results of the entered query to a file. Different formats are available for download. To export the items, click on the button corresponding with the preferred download format.

    By default, clicking on the export buttons will result in a download of the allowed maximum amount of items.

    To select a subset of the search results, click "Selective Export" button and make a selection of the items you want to export. The amount of items that can be exported at once is similarly restricted as the full export.

    After making a selection, click one of the export format buttons. The amount of items that will be exported is indicated in the bubble next to export format.