Title:
Comparative study of time-based and activity-based production scheduling
Authors:
Das, B.P.; Shah, N.; Chung, Paul Wai Hing; Huang, Wei
Abstract:
In this paper the principles behind the Time-based and Activity-based approaches to production scheduling are briefly explained. Based on a typical scheduling problem relating to chemicals processing sectors, two schedules using the two different approaches are generated for the purpose of comparison. The first schedule is generated using gBSS, which is a Time-based scheduling software package, which uses mathematical optimisation techniques. The second schedule is produced using BPS, which is a constraint-based scheduler following the principle of the Activity-based approach. A comparison is made between the two schedules considering three different aspects: (1) User input requirements to the problem (2) Quality of the schedule produced (3) Solution statistics. Interestingly, the two schedules produced by the two different approaches are slightly different, although both of them satisfied the product delivery requirements
Citation:
Das, B.P., Shah, N., Chung, P.W.H. and Huang, W. (2000), 'Comparative Study of Time-Based and Activity-Based Production Scheduling' Hungarian Journal of Industrial Chemistry 28: 7-10
Publisher:
University of Pannonia (Hungary)
Journal:
Hungarian Journal of Industrial Chemistry
Issue Date:
2000
URI:
http://hdl.handle.net/10547/275998
Additional Links:
http://konyvtar.uni-pannon.hu/en/node/229
Type:
Article
Language:
en
ISSN:
0133-0276
Appears in Collections:
Centre for Research in Distributed Technologies (CREDIT)

Full metadata record

DC FieldValue Language
dc.contributor.authorDas, B.P.en_GB
dc.contributor.authorShah, N.en_GB
dc.contributor.authorChung, Paul Wai Hingen_GB
dc.contributor.authorHuang, Weien_GB
dc.date.accessioned2013-03-26T11:58:41Z-
dc.date.available2013-03-26T11:58:41Z-
dc.date.issued2000-
dc.identifier.citationDas, B.P., Shah, N., Chung, P.W.H. and Huang, W. (2000), 'Comparative Study of Time-Based and Activity-Based Production Scheduling' Hungarian Journal of Industrial Chemistry 28: 7-10en_GB
dc.identifier.issn0133-0276-
dc.identifier.urihttp://hdl.handle.net/10547/275998-
dc.description.abstractIn this paper the principles behind the Time-based and Activity-based approaches to production scheduling are briefly explained. Based on a typical scheduling problem relating to chemicals processing sectors, two schedules using the two different approaches are generated for the purpose of comparison. The first schedule is generated using gBSS, which is a Time-based scheduling software package, which uses mathematical optimisation techniques. The second schedule is produced using BPS, which is a constraint-based scheduler following the principle of the Activity-based approach. A comparison is made between the two schedules considering three different aspects: (1) User input requirements to the problem (2) Quality of the schedule produced (3) Solution statistics. Interestingly, the two schedules produced by the two different approaches are slightly different, although both of them satisfied the product delivery requirementsen_GB
dc.language.isoenen
dc.publisherUniversity of Pannonia (Hungary)en_GB
dc.relation.urlhttp://konyvtar.uni-pannon.hu/en/node/229en_GB
dc.titleComparative study of time-based and activity-based production schedulingen
dc.typeArticleen
dc.identifier.journalHungarian Journal of Industrial Chemistryen_GB
All Items in UOBREP are protected by copyright, with all rights reserved, unless otherwise indicated.